The festival needed a technical partner for its main stage and second stage, plus the site-wide power distribution and cable infrastructure across a large meadow site.
Both stages were built with modular decks and truss structures, each equipped with its own PA, lighting rig and LED screens. Power was distributed from central feed points through 63 A distributions, with cable protector ramps on all walkways and access roads. A three-day load-in, three show days and a two-day load-out were coordinated from a technical office on site.
All stage changeovers ran within the planned timetable, and the cable and power layout was documented for reuse in the following season.